Tuesday, October 23, 2012

Windows! (August 2012)

With the roof done, we moved onto windows. We decided to install a total of 5 windows (4 salvaged from my old camp, and 1 that Buzzy found). All of the existing window openings needed to be modified and re-framed, and one of the walls needed repairing. Mark, Chad, Matt & Turbo all helped get the windows installed in two weekends.

Wall fixed and rough opening for window


Inside of fixed wall. And Matt.


Chad, Turbo & Matt working on the brook-side window openings


Two brook-side windows!


First window in!


Turbo checking out the rough opening for the 4th window


5th and final window in!!!

No comments:

Post a Comment