By late August, the windows were in and *I* was ready to focus my attention to the interior wiring and insulating and paneling... here I go:
As it turns out, there was still the small matter of wrapping up some important details. The siding around the windows needed to be replaced. The framing needed some bolstering. And there were hundreds of small trees laying dead all around from when Ray cleared my view for me. Details, details.
Mark worked on the siding...
Chad worked on the framing...
And I dragged the brush into piles... for hours on end...
They did have time, however, to do one very exciting thing on the inside: remove the center rafters (and reinforce the remaining trusses). We wanted to open it up to install a ceiling fan from the peak. On the two ends of the building, we're leaving the rafters, as-is, which will be made into two small lofts (can be used for storage... or sleeping space for small nephews :-) ). It was hard to get a photo of it, but trust me, it *really* opened up the place!
Mark also finished the tree clearing to make way for the electric/phone lines
Meanwhile, the brook was so low, we could barely hear it
And in the end, we wrapped it up and called it another productive weekend